The U.S. Army Corps of Engineers has proposed a substantial investment of $10 billion for infrastructure improvements aimed at safeguarding Boston from climate change-induced flooding. This initiative is part of a comprehensive six-year study assessing flood risks in the city, with new draft findings expected to be released for public comment soon. The recommendations include 20 projects involving the construction of levees and floodwalls across various neighborhoods, such as East Boston and South Boston.
Federal funding could cover about 65% of these costs, but state, local, and private entities will be responsible for the remaining expenses. Failure to act could potentially result in $54 billion in flood damages by 2090, as warned by the Army Corps. The study highlights that currently about 40% of Boston residents live in flood-prone areas.
The proposed projects would address 16 miles of vulnerable coastline and aim to protect crucial infrastructure, such as transportation and healthcare systems, benefiting not just Boston but also surrounding regions. The city’s chief climate officer emphasized the importance of taking action now, as each dollar invested in flood prevention is estimated to save $4 in damages.
Community feedback is deemed essential to ensure that the designs align with local needs and preferences. The public can comment on the projects until September 18, through various channels provided by the city.